How much did the Nord Stream 2 Baltic Sea pipeline cost to build?
Two pipes over 1,230 km from Russia to Germany
💡 Two steel pipes over 1,230 km on the Baltic seabed – each pipe segment weighs about 24 tonnes.
Answer
€9.5B
€9,500,000,000 · Construction cost · 2021
The pipeline was completed but never went into operation. In 2022 it was damaged by explosions.
Source: Nord Stream 2 AG (via Wikipedia)